Thor Explorations Ltd. (TSXV / AIM: THX) (“Thor Explorations” or the “Company”) is pleased to provide an operational update for the Segilola Gold Mine, located in Nigeria (“Segilola”), and for the Company’s mineral exploration properties located in Nigeria, Senegal and Burkina Faso for the three months to September 30, 2023 (the “Quarter” or “Q3”).

Highlights

Segilola Production

  • Gold production of 19,104 ounces (“oz”) during the Quarter at an average grade of 2.46 grammes per tonne (“g/t”) of gold (“Au”)

Segilola Exploration

  • Focus of exploration activities within a 25 kilometre (“km”) radius from the Segilola operations
  • Continuation of reverse circulation ("RC") drilling, stream sediment sampling and grid auger sampling at the Kola Prospect, which is located 23km south of Segilola with full results from the drilling during the Quarter still pending
  • Continuation of diamond drilling on identified high-grade quartz-vein style mineralisation at Aye-Ile prospect which is located 15km west of Segilola with several narrow high-grade intersections obtained

Douta Project

  • Pre-Feasibility Study (“PFS”) workstreams are ongoing targeting publication by the end of 2023
  • Environmental and Social Impact Assessment is ongoing
  • Metallurgical test work is continuing at IMO Laboratory in Perth, Western Australia
  • Compilation and reporting of geotechnical data
  • Resource drilling, which targeted the higher-grade parts of the existing inferred resource has been completed.

Thor Lithium Exploration

  • At Oyo Project Location 6 a total of 77 RC drillholes totalling 4,585 metres (“m”) were drilled
  • Significant intersections previously reported include 11m grading 1.53% lithium oxide (“Li2O”), 9m grading 2.42%Li2O and 11m grading 2.61%Li2O
  • Regional soil geochemical surveys commenced
  • Additional tenure obtained at both the Oyo and Ekiti Project Areas
  • Reconnaissance mapping and sampling at the Ekiti Project returned positive results including a rock chip sample grading 2.92%Li2O and drilling will commence at this Project in October 2023

Outlook

  • FY 2023 production guidance of 85,000 oz of gold maintained
  • AISC guidance for the year maintained at US$1,150 – US$1,350 per ounce
  • H2 2023 drilling programs:
    • Continuation of drilling at Segilola gold regional targets
    • Continuation of drilling at Oyo lithium prospect and commencement of drilling at the Ekiti lithium prospects in Nigeria
  • Completion of the Douta PFS
  • Continued assessment of prospective exploration properties in Nigeria
  • Continued exploration programs across our exploration portfolio in Nigeria

Segun Lawson, President & CEO, stated:

“As I commented in our H1 Financial and Operating Results announcement, we had anticipated that the mine grade would be lower in the period, and this has resulted in recovered gold being at the low end of expectation for the period.

“We are pleased that the main west wall push back is now complete and as at the quarter end, the operating conditions in the pit are much improved, facilitating the opening up of more mining faces and reducing any short term planning pressures.

“In Senegal, drilling at the Douta Project is now complete and final assays are pending. The Douta Pre-Feasibility Study workstreams are progressing and remain on track for completion by the end of the year.

“Following the successful initial drilling program at our West Oyo project area, which identified an initial high grade lithium opportunity, exploration activities are now focussed on working up additional nearby drilling targets. We have also added additional licences to our portfolio in the Ekiti project area which are now being followed up on with a view to commence drilling this quarter.”

Production and Sales update

In Q3 2023, mined and processed ore were 302,900 tonnes and 261,700 tonnes respectively. The average mined grade was 2.44 g/t and mill head grade 2.66 g/t, blended from mining and existing stockpile.

The mined grade was lower than originally forecast for the period due to grades intercepted in grade control drilling being lower than the reserve grades (based on exploration drilling). The density of exploration drilling in this area of the ore body was at the lower end for reserve classification and this under reconciliation is not expected to continue.

Gold recovery of 19,104 oz during the Quarter was lower than expectation due to the lower than forecast mine grade.

Mining operations continued in-line with the production target of 5,500,000 tonnes per quarter. Mining is forecast to remain at this level for the next two quarters.

The process plant throughput continued to operate above design during the Quarter. However, process recovery level was impacted due to a combination of lower head grade and decreased residence time in the Carbon In Pulp (“CIP”) circuit as a result of maintenance required on the carbon adsorption circuit in preparation for the leaching circuit upgrade.

The leaching circuit upgrade is scheduled to commence in October 2023 and enhancements to the circuit will be phased in during Q4 with final completion of the upgrade in Q1 2024. The enhancements are aimed at further improving process plant recoveries above the 94% achieved in H1 2023.

The ore stockpile is 338,600 tonnes of ore grading 0.94 g/t containing approximately 10,250oz and gold in-circuit is approximately 5,730oz.

During the Quarter, Segilola exported 19,118 oz of payable gold and 2,659 oz of payable silver.

Units

Q3 2023

Q2 2023

Q1 2023

Q4 2022

Q3 2022

Mining

Total Mined

Tonnes

5,673,200

5,633,700

4,194,700

4,296,500

4,018,400

Waste Mined

Tonnes

5,370,300

5,355,100

3,996,300

3,974,100

3,793,200

Ore Mined

Tonnes

302,900

278,600

198,400

322,400

225,200

Grade

g/t Au

2.44

2.43

2.85

3.51

4.43

Processing

Ore Processed

Tonnes

261,700

255,200

231,000

254,800

241,400

Grade

g/t Au

2.46

2.99

2.95

3.38

3.58

Recovery

%

92.3

94.0

94.1

95.0

95.5

Gold Recovered

oz

19,104

23,100

20,600

26,300

26,500

Note: Figures are rounded

Further details can be found on the Company’s website: www.thorexpl.com

About Thor Explorations

Thor Explorations Ltd. is a mineral exploration company engaged in the acquisition, exploration, development and production of mineral properties located in Nigeria, Senegal and Burkina Faso. Thor Explorations holds a 100% interest in the Segilola Gold Project located in Osun State, Nigeria and has a 70% economic interest in the Douta Gold Project located in south-eastern Senegal. Thor Explorations trades on AIM and the TSX Venture Exchange under the symbol “THX”.

THOR EXPLORATIONS LTD.
Segun Lawson
President & CEO

For further information please contact:

Thor Explorations Ltd
Email:

Canaccord Genuity (Nominated Adviser & Broker)
Henry Fitzgerald-O’Connor / James Asensio / Thomas Diehl

Tel: +44 (0) 20 7523 8000

Hannam & Partners (Broker)
Andrew Chubb / Matt Hasson / Jay Ashfield / Franck Nganou

Tel: +44 (0) 20 7907 8500

Fig House Communications (Investor Relations)
Tel: +1 416 822 6483
Email:

BlytheRay (Financial PR)
Tim Blythe / Megan Ray / Said Izagaren
Tel: +44 207 138 3203

    icon
    Presentation
    icon
    Financials
    icon
    Photo Gallery
    Thor Exploration Ltd.

    Register to receive news via email from Thor Exploration Ltd.

    * Required Fields